Final Deliverables and Schedule for Design

April 29, 2011 § Leave a comment

May 2nd Deadline…

All drawings need to be submitted by May 2nd, 2011.

Drawing Requirements

  1. Site plan with Roof Plan on it (1:250) ( Site Plan already exists in sketch up)
  2. Site Sections ( Min 2)
  3. Basement Plan (1:100) Should show ramps, lanes, parking, core location. Minimum two stairs connecting to ground floor.
  4. Ground Floor Plan (1:100) Should show complete site circulation, loading, urban experience of the street
  5. Typical floor plans (1:100)
  6. Sections( Min. 2) (1:100)
  7. Elevations(4)( 1:100)
  8. Concept Sheets
  9. Axonometric, Perspective Views, exploded Axonometric…
  10. Area calculation- Please follow format as Per Design Brief and Program requirement

May 5, 2011 Deadline

All models need to be submitted by May 5, 2011 @ 1pm. We will photograph the models in college that day itself.

  1. 1:250 block model with Site ( This we should be able to put on the big site model)
  2. 1:100 Detail Model on Site
  3. Circulation Model
  4. Process Models

All LWP work needs to be brought also.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

What’s this?

You are currently reading Final Deliverables and Schedule for Design at L / W / P House & (x) MUSEUM.

meta

%d bloggers like this: